On 7–8 July, the 30% model review for the incineration unit of Hubei Yihua's 110,000-tonne-per-year chlorine-resource industrial utilization project was held at Pyneo Co.,Ltd. Following joint review by the owner, Hubei Yihua New Energy; general contractor Hualu Engineering; and EPC contractor pyneo, the basic design and 30% three-dimensional model were approved. The milestone moves the project into detailed design and construction preparation.
The three teams checked design parameters and potential risks across the process scheme, piping layout, equipment interfaces, instrumentation and control, and battery-limit connections. pyneo presented technical clarifications and optimization proposals for the specific operating conditions of the chlorine-resource project. Vice President Ding Shenbing said the incineration unit is central to the project's environmental treatment and low-carbon operation. pyneo will use the review to maintain design quality and deliver a safe, reliable and technically advanced project.

Located in Baiyang Industrial Park of Yichang High-Tech Zone, the project has an investment of approximately RMB 632 million. It plans 100,000 tonnes per year of chloromethanes and a supporting 12,000-tonne-per-year tetrachloroethylene unit. It is a demonstration project in Yichang's chemical-industry closure, upgrading, relocation and transformation program and a key industrial-upgrading project for the 15th Five-Year Plan period. pyneo undertakes the incineration unit on an EPC basis.
The main treatment challenges are complex waste composition, sharply fluctuating calorific value and high levels of corrosive substances. pyneo has customized an integrated process of adiabatic incineration, waste-heat recovery, rapid quenching, hydrochloric-acid recovery, alkaline scrubbing and activated-carbon adsorption. Low-NOx combustion suppresses pollutants at source, while multistage downstream purification provides comprehensive treatment. Overall incineration efficiency can exceed 99.9%.

Once operating, the unit will close a green loop linking waste disposal, resource recovery and recovered heat, supporting Hubei Yihua Group's strategic transition toward new energy and advanced materials.
The review confirmed the design's soundness and feasibility and demonstrated close cooperation among the owner, general contractor and EPC contractor. pyneo's team will close out all review comments while advancing detailed design, procurement and construction preparation to support faster project delivery.